Project Description:
Reinforcement of 33Kv bus bar protection in 30 substations in central area.
MEECO Scope of Works:
Providing the engineering & design services for providing of 33Kv bus bar protection in 30 substations.
Electrical & Protection:
Design Bus Bar protection schematics, Preparing SLD with CT & VT data, CT sizing calculations, Modification of the panel’s front layout, Modification of protection logic diagram, Panel Interfacing, Relays setting calculations & Relay Coordination study, Preparation of power and control cable schedule and SCADA point list modification