Reinforcement Of Existing 33/13.8kv Substation SS#”7700, 7180, 7707, 7760, 7821 & 7804”
Client : | ETAC |
Engineering Services: | Electrical & Protection |
Completion Date : | Ongoing |
Project Description:
Add new 33Kv and 13.8Kv SWGR panels to existing switchgear in 6 S/S ”7700, 7180, 7707, 7760, 7821&7804”
MEECO Scope of Works:
Providing the engineering & design services for installation of new 33/13.8kV switchgears in 6 substations.
Electrical & Protection:
Preparation of the equipment layout, Preparing OSLD, Preparing SLD with CT & VT data, CT sizing calculations , Preparing protection diagram, Panel Interfacing, Relays setting calculations & Relay Coordination study, Preparation of power & control cable schedule and SCADA point list modification.