Replacement Of 13.8kv Panels Sec: A,B At S/S 8082
Client : | ETAC |
Engineering Services: | Electrical & Protection |
Completion Date : | Ongoing |
Project Description:
Existing 13.8kV switchgear for SEC.A, B will be replaced with new switchgear and three metering panels.
MEECO Scope of Works:
Providing the engineering & design services for installation of new 13.8kV switchgears.
Electrical & Protection:
Preparation of the equipment layout, Preparing OSLD, Preparing SLD with CT & VT data, CT sizing calculations, Preparing protection diagram, Panel Interfacing, Relays setting calculations & Relay Coordination study, Preparation of power & control cable schedule and SCADA point list modification.