Replacement Of 33kv Panels At S/S 8601-7604
Client : | ETAC |
Engineering Services: | Electrical & Protection |
Completion Date : | 2011 |
Project Description:
Replacement of the existing 33kV switchgear with new ABB switchgears with same configuration as the exiting switchgears.
MEECO Scope of Works:
Providing the engineering & design services for installation of new 33kV switchgears.
Electrical & Protection:
Preparation of the equipment layout, Preparing OSLD, Preparing SLD with CT & VT data, CT sizing calculations , Preparing protection diagram, Panel Interfacing, Relays setting calculations & Relay Coordination study, Preparation of power & control cable schedule and SCADA point list modification.