Replacement of existing two transformers with rated 33/13.8kV for 132/33/13.8kV S/S 8918

Client : ETAC Engineering Services: Protection Completion Date : 2011 Project Description: Complete installation of two used transformers (2X5) MVA one by one with all its relevant equipment, materials, fittings and connection to AVR, SCADA, switchgears 33kV, 13.8kV and protection relays panel. MEECO Scope of Works: Providing Relays setting, Coordination study & checking the Feasibility existing Drawing ...

Read more

Under Frequency Load shedding Scheme at 5 S/Ss (8781, 8782, 7780, 7781 & 7782) in WADI AL-DAWASIR Area

Client : ETAC Engineering Services: Electrical & Protection Completion Date : 2010 Project Description: An additional 2 nos. 55MW Generation units will be installed in Joba power plant in WADI AL-DAWASIR Area. This major change calls for new under frequency load shedding scheme having rate of change of frequency feature too and using modern technology under frequency relays. MEECO Scope of Works: Provid ...

Read more

132kV T.L – JOUF PROJECT

Client : ETAC Engineering Services: Electrical & Protection Completion Date : 2010 Project Description: Protection modifications & interfacing in 132Kv transmission line between four substations (Al-Jouf, Sakaka-A, Sakaka-B & Doumat Al-Jandal). MEECO Scope of Works: Providing full engineering & design services. Electrical & Protection: Preparation of the equipment layout, Preparing SLD w ...

Read more

Replacement Of 33kv Panels At S/S 8601-7604

Client : ETAC Engineering Services: Electrical & Protection Completion Date : 2011 Project Description: Replacement of the existing 33kV switchgear with new ABB switchgears with same configuration as the exiting switchgears. MEECO Scope of Works: Providing the engineering & design services for installation of new 33kV switchgears. Electrical & Protection: Preparation of the equipment layout, Pre ...

Read more

Replacement of 13.8kv Panels at S/S 8025

Client : ETAC Engineering Services: Electrical & Protection Completion Date : Ongoing Project Description: Replacement of the existing 13.8kV switchgear with new ABB switchgears with same configuration as the exiting switchgears with the additional of three feeder panels rated 1250A for future capacitor feeders’ use and three metering panels. MEECO Scope of Works: Providing the engineering & design ...

Read more

Installation Of 33kv Bus Bar Protection At (30) Substation

Client : ETAC Engineering Services: Electrical & Protection Completion Date : 2009 Project Description: Reinforcement of 33Kv bus bar protection in 30 substations in central area. MEECO Scope of Works: Providing the engineering & design services for providing of 33Kv bus bar protection in 30 substations. Electrical & Protection: Design Bus Bar protection schematics, Preparing SLD with CT & V ...

Read more

Replacement of Distance relay with overcurrent and earth fault relay (96 substations)

Client : ETAC Engineering Services: Electrical & Protection Completion Date : 2009 Project Description: Replacement of Distance relay with overcurrent and earth fault protection relay for 33KV U/G feeders in 96 substations in central area. MEECO Scope of Works: Providing the engineering & design services for providing of 33KV U/G feeder protection in 96 substations. Electrical & Protection: Prep ...

Read more

MEECO

MEECO core service includes designing and Engineering for EHV, HV, MV Substations and all low voltage and related applications development. We have successfully designed Electrical Substations and developed applications for clients in different vertical markets. Our technical experts are well versed in building Engineering  applications that encompass all aspects of business design activates for primary ...

Read more