Reinforcement of existing 132/33kv substations # 8810

Project Title : Reinforcement of existing 132/33kv substations # 8810 (sajir) by installing new 132kv GIS in Al-Qassim area.
Client : Al Babtain Contracting Co.
Engineering Services: Electrical, protection, Civil & Mechanical Design
Completion Date : Ongoing

Project Description:
Reinforcement of existing 132/33kv substations # 8810 (sajir) by installing new 132kv GIS in Al-Qassim area.


MEECO Scope of Works:
Providing Electrical (Primary), Protection (Secondary), Civil & Mechanical engineering & design services.

Electrical: 
Providing complete primary Design (calculations for Grounding, Indoor and Outdoor lighting, shielding, equipment sizing, Layout drawings preparation, Cable routing, AC & DC package, Vendor document review and preparation of Bill of Quantities…..etc).

Protection: 
Preparation of protection & metering logic diagrams. Preparation of detail design, cable schedule, SCADA/SAS points list, CT/VT sizing and relay settings, interfacing…….etc.

Civil:
Design of substation building with cable trench, power transformer, foundation site development plan, boundary fence & etc.

Mechanical:
HVAC and plumping systems design for GIS building.
Construction of new 132/13.8KV S/S 8256 and R.E of S/S 9038